The day was spent to finish the removal of the topsoil in the NE section of the excavation area which allowed to recognize a new context (34), a possible abandonment of the structure. The context is delimitated by walls 6 and 16, which were uncovered last year. At the same time, as we removed part of context 34, a new wall (33) appeared along the southern edge.

The team working in the SW and W part of the excavation area continued the removal of the topsoil, which should be fully removed tomorrow.