This morning at Castellaraccio, after a brief lesson on the use of the dumpy level, all the team focused on the removal of the final collapse (2) of the structure in Area 1. In doing so, we exposed the eastern part of a new wall (5) which was partially covered by the rubble. The wall alignment is E-W and it is probably dividing the area into two or more rooms.

Unfortunately, the weather condition forced us to leave the site around 12:00pm. We used the afternoon to visit the ruins of a medieval bridge and the Roman baths at Pietratonda.